日韩欧美亚洲一区-日韩欧美亚洲视频-日韩欧美亚洲国产-日韩欧美天堂-日韩欧美手机在线-日韩欧美视频在线一区二区

Location:HomeNewsCompany News

NEWS

(86)020-81326513

Stay Gold, Keep Mission in Mind and Forge ahead – Synchronization with Power Grid Has Been Accomplished for Guantao County Domestic Waste to Energy Project Contracted by GDE Edit Date:2021/02/09



       Guantao County Domestic Waste to Energy Project is located in Handan City, Hebei Province. The total daily capacity of waste is 800 tons. The project is divided into two phases:1st phase has capacity 500 t/d, equipped with 1× 500 t/d mechanical grate incinerator, 1×9MW steam turbine generator, with reserved land for the 2nd phase with 300t/d capacity.

       Since construction of the project started in September 2019, Project Department of our company has worked hard with unity, overcoming difficulties, and done solid jobs in all aspects of work with scientific control, comprehensive management, positive anti-epidemic and overcoming several effects such as rain season, cold winter, delay delivery of equipment etc. With concern and support of government departments at all levels and coordination of all project parties, a series of important milestones have been carried out such as foundation construction of main workshop , erection of the first batch of boiler steel, topping out of main building structure, boiler water pressure test, steam turbine generator running etc.

       According to the schedule required by ministries and agencies at all levels of Guantao County, Handan city, Hebei province at 05:28 am on 1st January, 2021, Synchronization with power grid has been accomplished at the 1st try. This is the 1st project with successful synchronization among 42 waste to energy projects under construction in the province in 2019.

       During the trial run, although the Chinese new year was coming soon, project staff actively mobilized resources from all sides and accelerated the overall progress of the project with good epidemic prevention measures.

       By 8th February, there were still 15 engineering and management personnel on duty on site in two daily shifts regularly inspecting boiler, steam engine and auxiliary equipment and other operating conditions, recording operating parameters of each equipment in detail to ensure normal operation of each equipment, and timely eliminate defects.

       When encountering difficulties, GDE project department accomplished missions. It is said that Keep fighting in gold armor until Lou Lan has been broken. All the staff of project department with firm faith, unity and dedication to their duties, strived to fight the tough battle at the end of the year.

Picture:

 Li Yu, thermal engineer was checking water pump

 Zhou Jianhe, electrical engineer, was instructing operation

 Lei Huanxin and Wei Chuanbin, thermal engineers were checking drawings on site

 Huang Guangbing, electrical engineer was monitoring power generation system

 Mr. Liang, Manager of Project Department was cooking for night shift staff at night before Luna Year Eve.

主站蜘蛛池模板: 国产欧美亚洲精品第一区 | 最近2019在线观看中文视频 | 三级特黄 | 成年人一级毛片 | 日日舔夜夜操 | 欧美视频一区二区专区 | 中国一级生活片 | 日本 在线观看 | 亚洲在线免费视频 | 黄网站免费视频 | 就要精品综合久久久久五月天 | 欧美精品区| 美女网站在线观看视频18 | 欧美色视频日本片免费高清 | 亚洲欧美日本在线观看 | 91精品在线播放 | 日韩亚洲人成在线综合 | 日韩 视频在线播放 | 亚洲精品久久一区毛片 | 深夜福利免费观看 | 天堂va在线 | 国产免费69成人精品视频 | 日本高清视频在线免费观看 | 亚洲精品成人一区二区 | 日韩精品免费在线视频 | 国产在线精品成人一区二区三区 | 日韩国产三级 | 欧美日韩一线 | 欧美成人精品三级网站 | 视频一区在线免费观看 | 搞黄视频免费看 | 日本aa在线 | 成人影院免费 | 夜色资源站国产www在线视频 | 亚洲欧美综合网站 | 日本a级无毛 | 天天看片天天爽 | 毛片啪啪视频 | 免费网站看v片在线香蕉 | 成年啪啪网站免费播放看 | 亚洲三级影院 |